RTL Group have undertaken a vast and varied number of projects in the UK across different business sectors, working alongside some of the countries best known brands.

RETAIL

RAAC Removal, Killingworth

This project was completed in September 2023 on a commercial warehouse in Killingworth. The existing RAAC deck was removed, we designed and installed a new structural metal deck with a new insulated waterproofing system, all fixed to the buildings existing steelwork structure. A scaffold crash deck was erected internally  to protect the internal fabric as well as our operatives, who successfully completed the works ahead of programme.

John Lewis, Kingston upon Thames

This project at John Lewis in Kingston Upon Thames was completed in Spring 2023. We stripped the existing roof and installed a new tapered insulation waterproofing system, installed new safety handrails, carried out drainage clearance with CCTV  survey to ensure free flowing drains and cleaned all other area's of  the roof.

At the annual IMA awards we were proud to have received 2 awards for our work on this project, head over to our news page to read more about this.

John Lewis, Edinburgh

We installed a new timber deck with an Icopal built up felt waterproofing system on this John Lewis retail building in Edinburgh city centre.

John Lewis, Arnold - Nottingham

We carried our structural repairs and cut edge corrosion treatment on this project for John Lewis

JLP Partnership, Killingworth

We carried out a full refurbishment of 2 roofs, installing an Icopal/BMI Profiles built up felt waterproofing and insulation system with a noxite cap sheet.

John Lewis, Reading

We installed a safety rail and cat ladder on this project in Reading

Wilkinsons, Abergavenny & Bulwell

Both projects involved the overlay of a defective single ply waterproof system with a new single ply membrane.

Cater Road, Bristol

We removed the defective multi layered single ply bituminous felt system and installed Icopal/BMI insulated built up felt waterproofing system.

Waitrose, Winton

We prepared the roof and installed Icopal/BMI Profiles built up felt waterproofing system with a noxite cap sheet to the existing cut to falls insulation. This works was carried out in conjunction with a full store refurbishment.

Waitrose, Menai Bridge

This project involved the removal of a defective polycarbonate roof over a staircase. We installed a new plywood deck to suit the profile of the original steelwork and covered with a new single ply waterproofing system. We also re-lined 200 linear metres of profiled internal gutter to the pitched mansard roof using IKO Armourflow pre-formed gutter lining

Waitrose, Cheltenham

An overlay of an existing single ply roof using Icopal/BMI Sealoflex Ultima re-inforced liquid applied coating

Waitrose, Dorchester

We stripped the existing defective waterproofing system, carried out asbestos removal and then installed Icopal/BMI Profiles built up felt waterproofing and insulation. Work was carried out in conjunction with a full internal store refurbishment.

Waitrose, Ruislip

We performed a full strip of the existing defective single ply waterproofing system. We supplied and installed Icopla/BMI Profiles built up felt waterproofing and insulation system and re-installed the staff patio/outdoor area.

Waitrose, Barnet

Work has completed at this Waitrose store in Barnet. We replaced 26 defective rooflights across the store roof, installed internal light diffusers and replaced a plant room door.

Waitrose, Norwich

This project involved a full strip of the cafe roof, supply and install of Icopal/BMI Profiles built up felt waterproofing and insulation system. We also carried out localised repairs across the rest of the stores roof which included pitched roofed area's, gutter inspection and cleaning. Installation of new plant louvres, electronic leak detection survey and repairs to the siphonic drainage system.


HEALTHCARE

Velindre Hospital, NHS Wales

Work started in March 2021 to remove the top sheet of upper profiled metal sheet on composite roof, we have upgraded the insulation, installed profiled cladding sheets and re-lined all gutters.

Child Development Centre, Hereford

This project was an overlay of the existing defective built up felt roof with the Icopal/BMI Profiles system

RUH Bath

Installation of a reinforced cold applied liquid waterproofing system and insulation boards

Cwmbrwla Ambulance Station

This project took place across two phases. The first involved the overlay of a defective built up felt roof with a vented underlayer and mineral capsheet on the Ambulance garage. The second was installation of a tapered insulation system over the staff area's and offices.

Musgrove Hospital

Work has just finished at Musgrove Hospital, we have installed Icopal/BMI Profiles system to a new building



EDUCATION

Cwm Primary School

Completed in the summer of 2022, this project invoved stripping the existing waterproofing, replacing with a new Icopal Profiles built up felt waterproofing system. We also installed new rooflights and carried out some internal refurbishment including flooring, decoration and installation of mechanical vents.


Rowanfield Infant School - Cheltenham

This project was completed in November 2022, it involved a full roof refurbishment, installation of a tapered insulation and built up felt waterproofing system. A. umber of roof lights were replaced and an extension built to a classroom.

Crickhowell High School

This project involved us removing the asbostos roof slates, upgrading the insulation to the roof, installing a new waterproof breather membrane, timber battens and new roofing slate. We also replaced some Velux windows and carried out some structural repairs.

Complete refurbishment

Work has been completed at the Maesteg Construction centre of Excellence. This involved a complete overhaul of the existing facility, including external facades, roof replacement, new windows, doors and rollershutters. Ensuring the whole building is DDA compliant. Internally, a full mechanical and electrical upgrade, improved classrooms, offices and welfare facilities.

NPTC Group of Colleges

We are part of a framework with NPTC Group of Colleges covering all capitol repair works and maintenance, including building and roofing works

Wills Memorial Building

This iconic building needed upgrades to all the flat roof area's using a reinforced liquid system and insulation

Coleg Gwent

This project involved asbestos removal including AIB, we removed the existing copper roofs and north lights, installing Kingspan insulated composite roof system and new roof lights

The Peak Academy, Dursley

Removal of defective roof covering and installation of a tapered insulation with a built up felt warm roof system.

Forest High School, Cinderford

We carried out a full strip of the existing roof, installing a warm insulated roof system, upgraded  all roof lights, removed asbestos and installed vertical profiled cladding.



Green Roofs

Green roof

Green Roof installation - Groundhog, Neath

We installed a full metal deck (circa 500 sq/m), facade cladding, anodised capping's, man safe system, anti-root elastomeric felt waterproofing system and a green roof with irrigation. Wildflower plugs, sedum and blanket sourced from within the UK, ensuring the quality required to meet planning requirements. This project was completed on programme and within budget.

Green roof

Green Roof - Down To Earth

This roof is a reciprocal timber structure with an IKO insulation and built up felt waterproffing system installed. A grass and sedum roof finishes the structure.



PETROL RETAIL

Petrol station new roof

Shell Petrol Station, Swaffham

This project involved a full removal of the existing defective waterproofing system and insualtion. Installation of new insulation and Icopal Monarplan single ply waterproofing  system mechanically fixed to the deck,  installation of pre-formed trims and new rain water outlets. We also carried out CCTV survey of the drainage system.



RESIDENTIAL

Extended living space, kitchen and new utility

This client wanted a rear extension across the full width of the house to allow for extended living space and open plan kitchen alongside a new utility room. The project was completed in August 2023. The new extension has a pitched roof with velux roof windows, a new kitchen/dining/living space complete with full decoration, new kitchen with large island, coordintaing utility room and large bi-fold doors ro the rear garden.

Extension build with new kitchen

This project was completed in July 2023 involving a new extension to an existing dwelling. The rear of the house was remodelled to work with the new extension space to create an open plan living/dining space. The renovation included re-positioning of the kitchen, creating a new utility area and a living/dining space in the new extension area complete with large roof lantern. Modern open plan living!

House refurbishment and upgrade

We carried out a full refurbishment and upgrade on this Cardiff property, turning it into 5 self contained flats, each one with its own kitchen, bathroom and 1 or 2 bedrooms.

Whole house renovation

Work has now completed on a whole house renovation in a Cardiff suburb. The renovations involved building a dormer loft conversion, adding ground and first floor extensions, creating extra bedrooms and bathrooms, a full electrical and mechanical reconfiguration, re-roofing works and full decoration throughout including fitted kitchen and bathrooms.

Single storey extension

We built a single storey, wrap-around orangery extension to the rear of the property. To provide lots of natural light a large glazed roof lantern was installed and bi-fold doors. We also installed a large decking area to the rear garden.

Full kitchen refurbishment

We removed the old kitchen, re-plastered, re-decorated and installed a new kitchen complete with quartz worktop.

Ensuite extension and refit

On this project the client wanted an existing ensuite made bigger and refitted with a walk-in shower, fitted units and a fully tiled wall and floor.

Bathroom refurbishment

We removed the existing bathroom suite and half tiled walls, installed a new larger bath with overhead shower, vanity unit and back to wall toilet unit. The floor and walls were fully tiled and LED's recessed under the bath front panel

Call Us

Give us a call to discuss how we can help on your next project